Plant 4 - Location extension with product development

In order to create the required production facilities for newly developed products and at the same time to bundle all business units in Austria in one place, the new plant 4 was built in Zagersdorf in immediate proximity to the existing plants 1, 2 and 3, where mainly laser cladding is carried out. These measures will increase synergies and thus contribute to greater flexibility in order to be able to process our customers' orders even faster.

Box 41 and 42: These boxes are designed for coating hydraulic components, components with a length of up to 4 m and a diameter of up to 700 mm and a weight of max. 4 tons to be coated. The hall has a crane runway consisting of 2 cranes with a payload of 5 tons each.

Box 43: This system is designed for the plasma coating of rotationally symmetrical components.

This project is co-financed by the European Regional Development Fund.

Further information on IWB / ERDF can be found on www.efre.gv.at.